Core service

New construction plumbing

We install complete plumbing systems for new homes and commercial buildings, from the first underground line to the final fixture. Our work is organized around your build schedule and coordinated with the other trades on site.

Builders and contractors count on clear communication, clean rough-ins, and code-conscious work that holds up to inspection and the years that follow.

Who we work with

  • Home builders and custom-home builders
  • General contractors
  • Developers and multi-family developers
  • Commercial contractors
  • Real estate investors
  • Remodeling contractors

Full-system installation

Everything the building needs to move water in and waste out.

  • Complete plumbing system installation
  • Water-supply piping
  • Drain, waste, and vent systems
  • Sewer-line and water-main installation
  • Gas piping
  • Underground plumbing

Fixtures and equipment

  • Fixture installation
  • Water-heater installation

Testing, code, and coordination

  • Code compliance and pressure testing
  • Plumbing inspections
  • Coordination with general contractors and architects
  • Permit coordination
  • Final testing and project closeout

The three phases of new-construction plumbing

Every build moves through these stages — we plan, test, and inspect at each one.

1

Underground phase

The work that goes in before the slab is poured.

  • Site plumbing layout
  • Trenching and underground drain installation
  • Underground waste and water-service piping
  • Sewer connections and slab penetrations
  • Plumbing sleeves and cleanout installation
  • Inspection preparation and pressure and leak testing
  • Backfilling after approval
2

Rough-in and top-out phase

Building out the system inside the walls and ceilings.

  • Water-supply lines
  • Drain, waste, and vent piping
  • Fixture locations and rough-ins for toilets, showers, tubs, and sinks
  • Water-heater connections
  • Roof vent and in-wall piping
  • Pressure testing
  • Coordination with framing, electrical, and HVAC
3

Finish phase

Setting fixtures and making everything work.

  • Toilet, sink, and faucet installation
  • Shower and tub trim
  • Water-heater startup and appliance connections
  • Final testing and leak inspection
  • Punch-list completion and final walkthrough

Frequently asked questions

Do you coordinate with our other trades?

Yes. We plan our rough-in and top-out around framing, electrical, and HVAC, and we work directly with general contractors and architects to keep the build moving.

Can you handle the whole plumbing scope on a project?

We do. We take a build from underground through rough-in, top-out, and finish, including testing, inspection prep, and closeout, so the plumbing scope stays with one crew.

How do you keep work ready for inspection?

We build to code, pressure and leak test at each stage, and prepare each phase for inspection so approvals do not hold up your schedule.

Do you work on multi-family and commercial builds?

Yes. We install plumbing for custom homes, multi-family projects, and commercial buildings, scaling the crew and approach to fit the size of the job.

Ready to get started?

Tell us about your plumbing problem or project and we'll get right back to you with next steps.